Check out some of the engineering projects developed by the Fenix Group:
April , 2019
Project for analyzes and calculations of the voltages generated by the Mooring the Swift 15k Capping Stack, through the application of pre-established loads.
Project developed to present the analyzes and calculations of the tensions generated in the gantry, through the application of pre-established loads.
Project to show the results the skid for tank in standard DNV Standard for certification No. 2.7-1 – Offshore containers.